04 / METHODOLOGY

How we work.

Every analysis separates what is verified from judgment, and states where the evidence is weak.

Five epistemic labels

Every claim is assigned a label indicating its analytical status.

FACTVerifiable data point from an identified source. Does not include causality.
JUDGMENTAnalytical judgment, with high, moderate or low confidence.
ASSESSMENTAssessment of impact or desirability, with an explicit confidence level.
ESTIMATEJ&H calculation or threshold; the calculation is shown.
J&H SCENARIOConditional trajectory, with probability band and confidence.

Probability bands

Fixed bands: very low 5–20 · low 20–40 · medium 40–60 · high 60–80 · very high 80–95. They are J&H judgments, not statistical projections. Confidence measures the strength of the evidence, not the likelihood that the scenario materialises.

Sources and asymmetries

We state where the evidence comes from and which positions were not consulted. Media outlets aligned with a particular actor are used only for documentable data, with their editorial line declared; foreign outlets are used for coverage, never for verification. Each source carries its level: primary, partly primary, secondary, referred or pending cross-check.

What we leave out

  • Unverified leaks.
  • Social-media posts without independent verification.
  • Advocacy figures used as data (kept as attributed claims).
  • Influence-campaign content: actively searched for, with the result declared.
  • The framing or qualification of any source; the underlying data is used.

Limits

Every document states its cut-off date. We do not attribute facts or intentions to actors. “Unclassified” describes the document; “restricted use” describes its circulation.

Use of artificial intelligence

Example, Ceuta 2026: the analysis was carried out with the support of artificial-intelligence tools for searching, organising and checking open sources, under the editorial direction of the responsible person, who set the criteria, corrected the content and approved the final version.

Source: document 6 of the Morocco–Israel 2026 collection (sections 10.1–10.9) and the production notice of Ceuta 2026. English wording is a translation of the Spanish originals.

See the collections →